GrindBenchThe daily grind, benchmarked.
← Rankings

GLM-5.3 Flash

How GLM-5.3 Flash did on real work, graded automatically. A grade is the share of its work that was right: no deal-breaker mistakes and at least 80% of the checklist.

A 8 or more in 10 deliverables acceptableB 6 to 8 in 10 acceptableC 4 to 6 in 10 acceptableD 2 to 4 in 10 acceptableF fewer than 2 in 10 acceptable
Report cardGrindBench-PubSec

Overall grade: B

61% of its work was right, with nothing to fix.

Z.ai (Zhipu)ChinaClosed weights
Kind of workGradeAcceptable
ATIP redactionD20%
Procurement evaluationB78%
Performance analysisC57%
Bilingual equivalenceA92%
Ranking11th of 28In group 2 of 9: models in a group are too close to call apart.
Cost per task0.53¢0.86¢ per acceptable result · about 1.5 min per task

Other measures

Weighted rubric score
91% · 10th best of 28
Grounding errors
13.2 per 1k words · 21st best of 28 (lower is better)
Ambiguity flagged
77% · 7th best of 28

Comment Strongest at bilingual equivalence (92%). Needs work on ATIP redaction (20%). In group 2 of 9 overall.

Report cardGrindBench-Banking

Overall grade: C

47% of its work was right, with nothing to fix.

Z.ai (Zhipu)ChinaClosed weights
Kind of workGradeAcceptable
Lending & mortgagesC50%
AML & KYCC50%
Deposits & paymentsC50%
Complaints & conductB70%
Credit riskD20%
Capital & liquidityC40%
Ranking9th of 18In group 2 of 4: models in a group are too close to call apart.
Cost per task1.4¢3.1¢ per acceptable result · about 1.6 min per task

Other measures

Weighted score
73% · 9th best of 18
Ambiguity flagged
96% · 3rd best of 18

Comment Strongest at complaints & conduct (70%). Needs work on credit risk (20%). In group 2 of 4 overall.

Compare GLM-5.3 Flash with

How it's marked

Every answer is checked by code and by an independent grader from a lab none of the tested models come from, against a checklist of what a manager would catch. One deal-breaker, like a wrong figure or a missed redaction, and the draft fails.

How we test, in full → · What would it cost for your work?

Next

See the work itself

Real tasks, what each model wrote, and exactly what the grader caught.